File #: RS-26-081    Version: 1 Name: Award Change Order No. 1 for 24-inch Water Line
Type: Resolution Status: Resolutions
File created: 4/20/2026 In control: City Council
On agenda: 5/19/2026 Final action:
Title: Consider a memorandum/resolution authorizing Change Order No. 1 for the 24-inch Highway 195 and Chaparral Road Water Line Project with Blackrock Construction, in the amount of $246,688.82.
Sponsors: Engineering
Attachments: 1. Change Order Finance Form, 2. Change Order No. 1, 3. Resolution 25-169R, 4. Presentation
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

 

Consider a memorandum/resolution authorizing Change Order No. 1 for the 24-inch Highway 195 and Chaparral Road Water Line Project with Blackrock Construction, in the amount of $246,688.82.

 

Body

 

DATE:                     May 19, 2026                     

 

TO:                     Kent Cagle, City Manager                     

 

FROM:                     Andrew Zagars, City Engineer                     

 

SUBJECT:                     Authorize Change Order No. 1 with Blackrock Construction for the 24-inch Highway 195 and Chaparral Road Water Line Project                     

 

BACKGROUND AND FINDINGS:

 

On October 21, 2025, City Council awarded a construction contract in the amount of $9,981,018 to Blackrock Construction for the construction of the 24-inch Highway 195 and Chaparral Road Water Line Project (CCM/R 25-169R).  This project, which will enable the transmission of water from the Chaparral Pump Station to the western half of the city is 60% complete.  The engineer’s construction estimate for this project was $19,983,000.

 

As this project was being constructed, several changes to the construction plans became apparent.  Change Request No. 1 and 2 for a total of $139,346.50 are to install the pipe where it crosses Chaparral Road in two places via bore and casing instead of open cut.  Due to traffic issues along Chaparral, this is a much safer construction method.  Change Request No. 3 and 4 for a total of $62,070 are for installing the 24-inch pipe via bore instead of open cut in two locations where open cut installation will put two concrete storm drain structures in jeopardy of collapse.  Change Request No. 5 and 6 for a total of $9,695 are for two items that were missing in the original design.  Change Request No. 7 for $35,577.32 is for using a hot tap at the 20-inch Stagecoach Road tie-in instead of cutting a tee in.  After further investigation at this site, staff found that the original tee option will put many people in that area out of water and under a boil water notice.  These seven changes will greatly enhance the safety and efficiency of this project.  The total increase for Change Order No. 1 of $246,688.82 equates to a 2.47% increase to the original contract.

 

THE ALTERNATIVES CONSIDERED:

 

N/A

 

Which alternative is recommended? Why?

 

N/A

 

CONFORMITY TO CITY POLICY:

 

This item conforms to state and local policies.

 

FINANCIAL IMPACT:

 

What is the amount of the revenue/expenditure in the current fiscal year? For future years?

 

Total amount of $246,688.82 will be encumbered in FY 2026.

 

Is this a one-time or recurring revenue/expenditure?

 

One-time

 

Is this revenue/expenditure budgeted?

 

Yes, $246,688.82 is available in the Water and Sewer Bonds CIP account 355-56201-900-400-922000.

 

If not, where will the money come from?

 

N/A

 

Is there a sufficient amount in the budgeted line-item for this revenue/expenditure?

 

Yes

 

RECOMMENDATION:

 

Authorize the City Manager, or designee, to execute Change Order No. 1 with Blackrock Construction in the amount of $246,688.82.

 