Legistar header
                                                         
File #: RS-18-084    Version: 1 Name: Bid 18-19
Type: Resolution Status: Passed
File created: 8/30/2018 In control: City Council
On agenda: 9/25/2018 Final action: 9/25/2018
Title: Consider a memorandum/resolution authorizing the award of Bid No. 18-19 for Concrete, Street Materials, Top Soil, Rock, and Slurry Seal Services.
Sponsors: Public Works Department, Transportation
Indexes: Street Material
Attachments: 1. Staff Report, 2. Bid Tabulation, 3. Certificate of Interested Parties, 4. Presentation
Related files: RS-20-045

TITLE

 

Consider a memorandum/resolution authorizing the award of Bid No. 18-19 for Concrete, Street Materials, Top Soil, Rock, and Slurry Seal Services.

 

SUMMARY

 

DATE:                     September 18, 2018

 

TO:                     Ronald L. Olson, City Manager

 

FROM:                     David A. Olson, Executive Director of Public Works

 

SUBJECT:                     Authorize the award of purchase contracts to Killeen Ready Mix, Killeen Crushed Stone, Green Dream International, DIJ Construction,                      Crafco, Inc., Viking Construction, Oldcastle Materials Texas, Roy D. Leifester, and Lone Star Paving for Concrete, Street Material, Top Soil,                      Rock, and Slurry Seal Services, Bid No. 18-19                     

 

BACKGROUND AND FINDINGS:

 

On August 15, 2018, at 2:15pm, bids were opened and read aloud for the procurement of the City’s estimated annual requirements of Concrete, Street Materials, Top Soil, Rock, and Slurry Seal Services. These items included Concrete, Sac Grout, Bedding Material, Thermoplastic, Crack Seal, Slurry Seal Services, Type D Asphalt, Type C Asphalt, 1.5 Asphalt Overlay, Cold Mix Asphalt, Top Soil, Base Material, and Rip Rap Rock. The City’s various Departments and Divisions utilize these materials in a variety of different applications, including construction and repair of roadways, parking areas, etc… The City’s previous material contracts have all expired.

 

Ten (10) vendors’ submitted bids: D.I.J. Construction, Crafco, Inc., Viking Construction, Inc., Roy D. Leifester, Killeen Crushed Stone, Intermountain Slurry Seal, Inc., Green Dream International, LLC, Lone Star Paving, Oldcastle Materials Texas, Inc., and Killeen Ready Mix, LTD. Bidders were instructed to bid items based upon an estimated annual need per item.

 

The lowest responsive and responsible bidder for each item is outlined below:

 

ITEM

MOST RESPONSIBLE BIDDER

BID PRICE

Concrete 3,000 PSI

Killeen Ready Mix

$100.00/cubic yard

Concrete 3,000 PSI plus 2% calcium

Killeen Ready Mix

$106.50/cubic yard

Concrete 4,000 PSI

Killeen Ready Mix

$110.00/cubic yard

8 Sac Grout

Killeen Ready Mix

$130.00/cubic yard

Bedding Material 3/8 F - Plant

Green Dream International

$13.13 per ton

Bedding Material 3/8 F- Destination

Killeen Crushed Stone

$20.00 per ton

Bedding Material ½ D - Plant

Killeen Crushed Stone

$14.50 per ton

Bedding Material ½ D - Destination

Killeen Crushed Stone

$20.00 per ton

Bedding Material 1 D - Plant

Green Dream International

$8.19 per ton

Bedding Material 1 D - Destination

Green Dream International

$19.58 per ton

Thermoplastic - White

D.I.J. Construction

$0.65 per lb

Thermoplastic - Yellow

D.I.J. Construction

$0.65 per lb

Thermoplastic - Black

D.I.J. Construction

$0.63 per lb

Crack Seal Material - Polyflex III

Crafco

$0.48 per lb

Slurry Seal Services-Pay Item 25lbs

Viking Construction

$3.15/square yard

Slurry Seal Services-Pay Item 18lbs        Viking Construction  

$2.71/square yard

 

Type D Asphalt - Plant

Oldcastle Materials

$60.00 per ton

Type C Asphalt - Plant

Oldcastle Materials

$65.00 per ton

1.5 Asphalt Overlay

Lone Star Paving

$8.75/square yard

Cold Mix Asphalt - Plant

Oldcastle Materials

$68.00 per ton

Cold Mix Asphalt - Destination

Oldcastle Materials

$76.00 per ton

Quality Sandy Loam Top Soil - Plant      Killeen Crushed Stone    

$10.00 per ton

 

Quality Sandy Loam Top Soil-Destination

Roy D. Leifester

$11.45 per ton

Base Material - Plant

Killeen Crushed Stone

$4.95 per ton

Base Material - Destination

Killeen Crushed Stone

$10.50 per ton

Rip Rap 18-24” - Plant

Killeen Crushed Stone

$23.00 per ton

Rip Rap 18-24” - Destination

Roy D. Leifester

$22.45 per ton

Rip Rap 12-18” - Plant

Killeen Crushed Stone

$23.00 per ton

Rip Rap 12-18” - Destination

Roy D. Leifester 

$22.45 per ton

Rip Rap 8-12” Medium - Plant

Killeen Crushed Stone

$23.00 per ton

Rip Rap 8-12” Medium-Destination

Roy D. Leifester

$22.45 per ton

Rip Rap 3-5” - Plant

Green Dream International

$9.87 per ton

Rip Rap 3-5” - Destination

Killeen Crushed Stone

$16.00 per ton

 

The bid solicitation also provided that if the current bidder(s) cannot fulfill an order, the City will then purchase from other area vendors that have available material that meet specifications. Due to fluctuating market conditions of the materials, the bid solicitation requires that bidder’s prices remain fixed during the first twelve (12) months of the contract. The contract term for this award is for a term of one (1) year with the option to extend the same for four (4) additional six (6) month periods, if agreed to by both parties.

 

THE ALTERNATIVES CONSIDERED:

 

1.                     Award the bid based upon submittals received

2.                     Reject all bids, continue using purchases on a “per order” status

 

Which alternative is recommended? Why?

 

Recommend Alternate One Award of bid based upon submittals received. This is the most beneficial for the City of Killeen.

 

CONFORMITY TO CITY POLICY:

 

Per Purchasing Policy, Purchas of $50,000.00 or more, by State law, triggers the competitive procurement process. The ITB uses the competitive sealed bid method. Requirements are clearly defined, negotiations are not necessary and price is the major determining factor for selection.

 

FINANCIAL IMPACT:

 

What is the amount of the expenditure in the current fiscal year? For future years?

 

Projected expenditures are utilized for the City to obtain the best rate per unit pricing covering multiple City Departments and fiscal years. Actual costs per fiscal year for each Department may be significantly lower and will not exceed Departmental budgets. The final fiscal impact will be based upon the allocated budget and work load for the year.

 

Is this a one-time or recurring expenditure?

 

The purchases will be recurring expenditures with fixed prices for the first twelve months of the contract. The contract term for the award can be extended the same for four (4) additional six (6) month periods, if agreed by both parties.

 

Is this expenditure budgeted?

 

Yes, all purchases of materials are budgeted within the individual Department's budget.

 

If not, where will the money come from?

 

N/A

 

Is there a sufficient amount in the budgeted line-item for this expenditure?

 

Yes

 

RECOMMENDATION:

 

City staff recommends that City Council award purchase contracts to Killeen Ready Mix, Killeen Crushed Stone, Green Dream International, DIJ Construction, Crafco, Inc., Viking Construction, Oldcastle Materials Texas, Roy D. Leifester, and Lone Star Paving for the purchase of various Concrete, Street Materials, Top Soil, Rock, and Slurry Seal Services; authorize the City Manager to enter into a contract with the same, including the proposed extensions described; and finally, authorize the City Manager to execute any and all change orders in the amounts established by state and local law.

 

DEPARTMENTAL CLEARANCES:

 

Legal

Finance

Public Works

 

ATTACHED SUPPORTING DOCUMENTS:

 

Bid Tabulation

Certificate of Interested Parties